For plumbers and electricians

A plumber or electrician usually needs the quote here and now – on site, with the client. manoobjektas.lt lets you build it on your phone in a few minutes and get approval before you leave.

A quote while you are still on site

You have inspected the bathroom, counted the points, you know how long it will take. Usually you say "I'll send the quote tonight" – and tonight it competes with two others the client received in the meantime. With manoobjektas.lt you build the quote from your rates on the spot: installation points, pipework, fixture connection, cable metres, consumer unit. The client gets a link and often approves before you have driven off.

Your rates, your PDF

You set up the rate library your way: point, metre, set, hour. The PDF quote is generated with your logo, company details and the warranty terms you enter once. It looks like a company document, not a text message.

If you also work for contractors as a subcontractor, the same quote works for them – by link or as a PDF.

Extra works that always turn up on site

Opening a wall shows the risers need replacing, or the client decides to add three more sockets. You photograph it, enter the price, the client approves on their phone. The work is recorded against the job site, and on invoice day nobody has to explain where the extra amount came from.

Payments and several job sites a day

  • For each job site – deposit, payments and balance. You see who still owes.
  • A job site list on your phone: address, client, status. Tomorrow's plan in one place.
  • Runs in the browser, nothing to install. Photos straight from the phone camera.

Up and running in 10 minutes

Enter rates for your 15–20 most common works, upload your logo, add your first job site. First quote the same day. 7 days free, no card.

Frequently asked questions

Can I price per point instead of per hour?

Yes. You choose the unit: point, metre, set, hour or piece. One estimate can mix different units.

Can the client approve without a signature or online banking?

Yes. The client just opens the link and taps "Approve". The approval is recorded with date and time. Payment happens as usual – by transfer or in cash.

Does it work on site without internet?

An internet connection is needed – the tool runs in the browser. Mobile data is enough, and photos are uploaded compressed.

Start today. Your first estimate in 10 minutes.

Try free for 7 days

No card needed. Cancel any time.